Villa | Etagnières – Vaud | 2018 ENG
Project description:
Construction of 1 detached villa and 4 semi-detached villas
Energy reference area (ERA): 250 m2
Description of DDE services:
Energy study, building physics, thermal envelope and technical installations.
Heat production with a 5×10 kW geothermal probe heat pump
Solar photovoltaic system 5×2.8 kWp