Administrative building | Yverdon-les-Bains – Vaud | 2020

Project description:

Construction of an office building

Energy reference area (ERA): 2’152 m2

Description of services DDE :

Energy study, building physics, thermal envelope and technical installations.

Heat production with a 75 kW geothermal probe heat pump

32 kWp photovoltaic solar system