Industrial building | Ependes – Vaud | 2018
Project description:
Construction of a storage hall
Energy reference area (ERA): 1’878 m2
Description of services DDE :
Energy study, building physics, thermal envelope and technical installations.
Heat generation by 35 kW gas-fired boiler
2.5 kWp photovoltaic solar system
10 m2 solar thermal system